Double speed chain assembly line-2

工装板线
March 31, 2025
Category Connection: Double Speed Chain Assembly Line
Brief: Discover the Environmentally Friendly Double Speed Chain Assembly Line for Green Manufacturing by CARST. This high-efficiency system offers unmatched productivity with dual-chain speeds of 20m/min and ±0.15mm precision. Ideal for automotive frame assembly and heavy machinery production, it features superior load capacity and smart maintenance for reduced downtime.
Related Product Features:
  • Operates at dual-chain speeds of 20m/min with ±0.15mm precision, 40% faster than conventional systems.
  • Reinforced alloy chains withstand 3-ton loads continuously with wear-resistant bushings for extended service life.
  • Integrated vibration sensors and automated lubrication ports reduce unplanned downtime by 60%.
  • Customizable frame material, workboard size, and worktable height to suit specific manufacturing needs.
  • Accurate and stable conveying speed with optional intelligent control for precise synchronous conveying.
  • Can be stacked and transported, suitable for storage and transportation in assembly production lines.
  • Provides 3D installation drawings and on-site installation services for seamless integration.
  • Full line layout plan available based on your factory requirements for optimized production flow.
Faqs:
  • What makes the Double Speed Chain Assembly Line environmentally friendly?
    The assembly line is designed for green manufacturing with energy-efficient operations and reduced waste, featuring smart maintenance systems that minimize resource usage.
  • Can the assembly line handle heavy loads?
    Yes, the reinforced alloy chains are built to withstand continuous 3-ton loads, making it ideal for heavy manufacturing applications like automotive frame assembly.
  • Is customization available for the assembly line?
    Absolutely. The frame material, workboard size, worktable height, and transportation speed can all be customized to meet your specific production needs.
Related Videos

ESD workbench-3

工作台
April 07, 2025

Belt conveyor line-9

皮带传输线
March 20, 2025

ESD workbench-13

工作台
April 07, 2025

Belt conveyor line-12

皮带传输线
March 20, 2025

ESD workbench-15

工作台
April 07, 2025

ESD workbench-14

工作台
April 07, 2025